$5,000,000

Chad Block H

CGIP is looking to divest its interest in Block H (Lake Chad). 3500 sqkm modern 3D seismic and 4500 line km 2D seismic.

11 discoveries on 16 exploration wells.

Early production planned, >1500 bopd expected.

90 mmbls 2C contingent resources, PMean unrisked 10+ Bbbls STOIIP, Risked 4+ Bbbls. 1.2 Bbbls recoverable.

3 distinct play areas – Sedigi, Kanem an NE3D.

Minimum capital at risk – 3D seismic costs ~$13,500 per sqkm, drilling costs ~$9.2m per well.

Phase 1 find costs of ~$1 per bbl.

 

Details

Asset Name : Chad Block H
Ref : AF-TCD-Block H
Continent : Africa
Country : Chad
Location : Onshore
Project Phase : Appraisal / Development
Latitude : 14.4583
Longitude : 14.0417
Operator : CGIP Energy
Farmout company : CGIP Energy
Mandated Agent : None
Work Programmes : Drilling, Development
Back Costs : $1m - $10m
Equity Offered : 80 - 100%
Deal Status : Open
FarmoutAngel Valuation : $5,000,000 - $10,000,000
FarmoutAngel confidence : High
Consideration Sought : $5,000,000

Find on Map

Get Directions

i


I consent to have this site collect my Name, Email, and Phone.

Search Assets

Go to Top