Chad Block H
CGIP is looking to divest its interest in Block H (Lake Chad). 3500 sqkm modern 3D seismic and 4500 line km 2D seismic.
11 discoveries on 16 exploration wells.
Early production planned, >1500 bopd expected.
90 mmbls 2C contingent resources, PMean unrisked 10+ Bbbls STOIIP, Risked 4+ Bbbls. 1.2 Bbbls recoverable.
3 distinct play areas – Sedigi, Kanem an NE3D.
Minimum capital at risk – 3D seismic costs ~$13,500 per sqkm, drilling costs ~$9.2m per well.
Phase 1 find costs of ~$1 per bbl.
Details
Asset Name
:
Chad Block H
Ref
:
AF-TCD-Block H
Continent
: Africa
Country
: Chad
Location
: Onshore
Project Phase
: Appraisal / Development
Latitude
:
14.4583
Longitude
:
14.0417
Operator
:
CGIP Energy
Farmout company
:
CGIP Energy
Mandated Agent
:
None
Work Programmes
: Drilling, Development
Back Costs
: $1m - $10m
Equity Offered
: 80 - 100%
Deal Status
:
Open
FarmoutAngel Valuation
: $5,000,000 - $10,000,000
FarmoutAngel confidence
: High
Consideration Sought
:
$5,000,000